3/29/2024 | |
252.25
|
312.75
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.33 |
3/30/2023 | |
256.59
|
308.41
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.33 |
3/29/2022 | |
248.70
|
316.30
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.40 |
3/23/2021 | |
247.75
|
317.25
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.33 |
3/30/2020 | |
260.42
|
304.58
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.33 |
3/27/2019 | |
251.34
|
313.66
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.33 |
3/29/2018 | |
250.92
|
314.08
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.33 |
3/31/2017 | |
234.59
|
330.41
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.33 |
3/30/2016 | |
237.33
|
327.67
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.67 |
3/28/2014 | |
131.41
|
433.59
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.67 |
3/30/2011 | 09:45:00 |
213.04
|
351.96
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 1.70 |
11/10/2010 | 11:51:00 |
229.49
|
335.51
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 1.70 |
3/10/2010 | 13:16:00 |
206.83
|
358.17
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 1.70 |
10/8/2009 | 09:10:00 |
210.70
|
354.30
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 1.70 |
3/24/2009 | 08:51:00 |
201.75
|
363.25
|
OWRD
|
GWATER
| ETAPE | STATIC | 1.70 |
3/14/2009 | |
201.50
|
363.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.50 |
3/20/2008 | 09:37:00 |
203.02
|
361.98
|
OWRD
|
GWATER
| ETAPE CALIBRATED | STATIC | 1.70 |
2/1/2008 | 09:29:00 |
203.00
|
362.00
|
OWRD
|
GWATER
| ETAPE | STATIC | 1.70 |
3/17/2004 | |
182.50
|
382.50
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | UNKNOWN | 1.50 |
3/3/1999 | 10:00:00 |
100.80
|
464.20
|
PUMP INSTALLER
|
PUMP TEST PROGRAM
| REPORTED | STATIC | 1.70 |
|
|