3/24/2021 | |
5.75
|
209.25
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/19/2019 | |
5.30
|
209.70
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/26/2018 | |
5.46
|
209.54
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/2/2017 | |
8.33
|
206.67
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/16/2016 | |
11.38
|
203.62
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.08 |
3/15/2015 | |
8.71
|
206.29
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.08 |
2/24/2014 | |
6.17
|
208.83
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
4/16/2013 | |
6.96
|
208.04
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
5/7/2012 | |
5.58
|
209.42
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
7/21/2011 | |
17.75
|
197.25
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.08 |
3/25/2009 | |
5.83
|
209.17
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
3/5/2004 | |
4.62
|
210.38
|
PUMP INSTALLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 1.00 |
7/27/2000 | |
10.00
|
205.00
|
DRILLER
|
WELL LOG
| REPORTED | UNKNOWN | |
|
|