| 3/18/2026 | |
578.00
|
94.22
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.90 |
| 3/15/2025 | |
573.70
|
98.52
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.90 |
| 3/19/2024 | |
573.90
|
98.32
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.90 |
| 3/15/2023 | |
573.50
|
98.72
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.90 |
| 3/17/2022 | |
567.10
|
105.12
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.90 |
| 3/4/2021 | |
573.00
|
99.22
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.90 |
| 3/13/2020 | |
571.90
|
100.32
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.90 |
| 3/19/2019 | |
571.20
|
101.02
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.90 |
| 3/22/2018 | |
569.70
|
102.52
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.90 |
| 3/8/2017 | |
567.30
|
104.92
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.90 |
| 3/3/2016 | |
566.30
|
105.92
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.80 |
| 3/16/2015 | |
565.40
|
106.82
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.30 |
| 3/13/2014 | |
560.50
|
111.72
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.30 |
| 3/12/2013 | |
560.83
|
111.39
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.25 |
| 3/6/2012 | |
560.90
|
111.32
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/8/2011 | |
562.00
|
110.22
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 2.00 |
| 3/3/2010 | |
560.25
|
111.97
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/11/2008 | |
559.00
|
113.22
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/12/2007 | |
557.00
|
115.22
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
| 3/21/2006 | |
555.00
|
117.22
|
DRILLER
|
PERMIT CONDITION PROGRAM
| ETAPE | STATIC | 3.00 |
|
|