Oregon Water Resources Department
Well Log Information System
Well Log:
UMAT 489
Main
Help
Return
Contact Us
Well Information
(Click to Collapse...)
Identification
Type of Report:
Water Well
Type of Work:
NEW
Well Report:
UMAT
489
View Log
Groundwater Site
Well Label:
Start Card:
Original Report:
Owner Well Nbr:
Company Job Nbr:
Primary Use:
DOMESTIC
Complete Date:
08/10/1970
Land Owner
Name:
VERNON C LANE
Company:
Address:
RT 2 BOX 31-A
ECHO, OR
Location
(Click to Collapse...)
Latitude/Longitude
Latitude:
45.66965946
Longitude:
-119.07485333
Horiz. Error:
1000.00
ft.
Location
County:
UMAT
TRSQQ:
WM2.00N30.00E9SWNW
Tax Map:
Tax Lot:
Lot:
Block:
Subdivision:
Street of Well:
WM District:
5
Surface Elev:
Well Report Mapping Tool
Powered by
Esri
Zoom In
Zoom Out
Topographic
Esri World Geocoder
Search
Tax Lots
Note: Tax lot overlay available only for a few counties.
Well Construction
(Click to Collapse...)
Construction
Start Date:
08/06/1970
Completed Date:
08/10/1970
Drill Method:
Rotary Air
Depth of Completed Well:
80.00
Est. Depth Drilled:
80.00
Special Standards:
Seal Placed Method:
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement:
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack:
Filter Pack Material:
Filter Pack Size:
Bore Hole
Row
Diameter (in)
From (ft)
To (ft)
1
13.00
0.00
58.00
2
10.00
58.00
80.00
Seal
Row
Material
From (ft)
To (ft)
Amount
Amount Calc.
1
Cement
0.00
58.00
17.00
Abandonment Log
No data matches search criteria.
Casing/Liner
Row
Casing/Liner
Diameter (in)
Above Land Surface
From Depth
To (ft)
Gauge
Material
Weld
Glue
Thread
Shoe
Inside
Shoe
Outside
Shoe
Other
Shoe
Location
1
Casing
10.00
0.00
58.00
.250
Steel
●
Temporary Casing
No data matches search criteria.
Perforations
No data matches search criteria.
Screens
No data matches search criteria.
Well Test
(Click to Expand...)
Well Test
Temperature:
55 F
Lab Analysis:
Lab Analysis Done By:
Total Dissolved Solids:
Water Quality Concerns:
Well Test
Test Type
Yield (gpm)
Drawdown
Drill Stem/
Pump Depth
Duration (hr)
Calculated Specific Capacity (gpm/ft)
Air
52.0
20.00
1.0
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
Static Water Level
Depth First Water:
70.00
Pre-Static Water Level:
Pre-Static Water Level Date:
Post-Static Water Level:
20.00
Post-Static Water Level Date:
08/10/1970
Static Water Level
Row
Date
From(ft)
To(ft)
SWL
Est. Flow Rate
PSI
1
8/10/1970
70.00
80.00
20.00
Lithology
(Click to Expand...)
Material
Row
From
To
Material
Static Water Level
1
0.00
15.00
CLAY WHITE SOFT
2
15.00
42.00
CLAY BROWN SOFT
3
42.00
48.00
BASALT GRAY SOFT
4
48.00
52.00
GRAVEL MEDIUM
5
52.00
70.00
BASALT GRAY HARD
6
70.00
80.00
BASALT GRAY POROUS
20.00
Well Constructor
(Click to Expand...)
Bonded Driller Name:
GARY HEISEY
Bonded Driller Company:
PROJECT CORP
Bonded Driller Number:
527
Bonded Date Signed:
09/08/1970
Unbonded Name:
Unbonded Company:
Unbonded Number:
Unbonded Date Signed:
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
Comments
(Click to Expand...)
No data matches search criteria.
Documents
(Click to Expand...)
Title
Document Type
Source
Download Image
UMAT 489
WELL REPORT
DRILLER
Image