Oregon Water Resources Department
Well Log Information System
Well Log:
WASH 7239
Main
Help
Return
Contact Us
Well Information
(Click to Collapse...)
Identification
Type of Report:
Water Well
Type of Work:
NEW
Well Report:
WASH
7239
View Log
Groundwater Site
Well Label:
Start Card:
79225
Original Report:
Owner Well Nbr:
Company Job Nbr:
Primary Use:
IRRIGATION
Complete Date:
06/06/1995
Land Owner
Name:
Company:
MIKE CROPP FARMS
Address:
31345 NW NORTH AVE
CORNELIUS, OR 97113
Location
(Click to Collapse...)
Latitude/Longitude
Latitude:
45.59189002
Longitude:
-122.96299060
Horiz. Error:
250.00
ft.
Location
County:
WASH
TRSQQ:
WM1.00N2.00W8NWNW
Tax Map:
Tax Lot:
Lot:
Block:
Subdivision:
Street of Well:
JACKSON SCHOOL RD
WM District:
18
Surface Elev:
Well Report Mapping Tool
Tax Lots
Note: Tax lot overlay available only for a few counties.
Well Construction
(Click to Collapse...)
Construction
Start Date:
05/25/1995
Completed Date:
06/06/1995
Drill Method:
Rotary Air
Depth of Completed Well:
575.00
Est. Depth Drilled:
575.00
Special Standards:
Seal Placed Method:
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement:
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack:
Filter Pack Material:
Filter Pack Size:
Bore Hole
No data matches search criteria.
Seal
No data matches search criteria.
Abandonment Log
No data matches search criteria.
Casing/Liner
Row
Casing/Liner
Diameter (in)
Above Land Surface
From Depth
To (ft)
Gauge
Material
Weld
Glue
Thread
Shoe
Inside
Shoe
Outside
Shoe
Other
Shoe
Location
99
Casing
8.00
Temporary Casing
No data matches search criteria.
Perforations
No data matches search criteria.
Screens
No data matches search criteria.
Well Test
(Click to Expand...)
Well Test
Temperature:
58
Lab Analysis:
Lab Analysis Done By:
Total Dissolved Solids:
Water Quality Concerns:
Well Test
Test Type
Yield (gpm)
Drawdown
Drill Stem/
Pump Depth
Duration (hr)
Calculated Specific Capacity (gpm/ft)
Air
500.0
575
1.0
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
Static Water Level
Depth First Water:
350.00
Pre-Static Water Level:
Pre-Static Water Level Date:
Post-Static Water Level:
80.00
Post-Static Water Level Date:
06/06/1995
Static Water Level
No data matches search criteria.
Material
No data matches search criteria.
Well Constructor
(Click to Expand...)
Bonded Driller Name:
ROY N JANNSEN
Bonded Driller Company:
Bonded Driller Number:
1266
Bonded Date Signed:
Unbonded Name:
Unbonded Company:
Unbonded Number:
Unbonded Date Signed:
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
No data matches search criteria.
Documents
(Click to Expand...)
Title
Document Type
Source
Download Image
WASH 7239
WELL REPORT
DRILLER
Image