Oregon Water Resources Department
Well Log Information System
Well Log:
CROO 1540
Main
Help
Return
Contact Us
Well Information
(Click to Collapse...)
Identification
Type of Report:
Water Well
Type of Work:
NEW
Well Report:
CROO
1540
View Log
Groundwater Site
Well Label:
Start Card:
Original Report:
Owner Well Nbr:
7
Company Job Nbr:
Primary Use:
COMMUNITY
Complete Date:
09/04/1957
Land Owner
Name:
Company:
PACIFIC POWER AND LIGHT CO.
Address:
920 SW 6TH AVE
PORTLAND, OR 97204
Location
(Click to Collapse...)
Latitude/Longitude
Latitude:
44.31736959
Longitude:
-120.86202612
Horiz. Error:
100.00
ft.
Location
County:
CROO
TRSQQ:
WM14.00S16.00E31NWNW
Tax Map:
Tax Lot:
Lot:
Block:
Subdivision:
Street of Well:
SOUTH 58 DEG 13 MIN 20 SEC EAST, 1447 FEET FROM NW CORNER, SECTION 31
WM District:
24
Surface Elev:
Well Report Mapping Tool
Tax Lots
Note: Tax lot overlay available only for a few counties.
Well Construction
(Click to Collapse...)
Construction
Start Date:
05/20/1957
Completed Date:
09/04/1957
Drill Method:
Cable
Depth of Completed Well:
256.00
Est. Depth Drilled:
256.00
Special Standards:
Seal Placed Method:
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement:
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack:
Filter Pack Material:
Filter Pack Size:
Bore Hole
No data matches search criteria.
Seal
No data matches search criteria.
Abandonment Log
No data matches search criteria.
Casing/Liner
Row
Casing/Liner
Diameter (in)
Above Land Surface
From Depth
To (ft)
Gauge
Material
Weld
Glue
Thread
Shoe
Inside
Shoe
Outside
Shoe
Other
Shoe
Location
42264
Casing
24.00
0.00
230.00
0.3125
●
42265
Casing
12.00
0.00
228.00
0.3125
●
42266
Casing
12.00
253.00
256.00
Temporary Casing
No data matches search criteria.
Perforations
No data matches search criteria.
Screens
No data matches search criteria.
Well Test
(Click to Expand...)
Well Test
Temperature:
F
Lab Analysis:
Lab Analysis Done By:
Total Dissolved Solids:
Water Quality Concerns:
Well Test
Test Type
Yield (gpm)
Drawdown
Drill Stem/
Pump Depth
Duration (hr)
Calculated Specific Capacity (gpm/ft)
Pump
550.0
84.0
8.0
6.55
Pump
800.0
200.0
1.0
4.00
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
Static Water Level
Depth First Water:
Pre-Static Water Level:
Pre-Static Water Level Date:
Post-Static Water Level:
17.00
Post-Static Water Level Date:
09/04/1957
Static Water Level
No data matches search criteria.
Material
No data matches search criteria.
Well Constructor
(Click to Expand...)
Bonded Driller Name:
ROBERT L STRASSER
Bonded Driller Company:
R. J. STRASSER DRILLING CO.
Bonded Driller Number:
10
Bonded Date Signed:
Unbonded Name:
Unbonded Company:
Unbonded Number:
Unbonded Date Signed:
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
No data matches search criteria.
Documents
(Click to Expand...)
Title
Document Type
Source
Download Image
CROO 1540
WELL REPORT
DRILLER
Image