Well Information
(Click to Collapse...)
 
Identification
Type of Report: Water Well
Type of Work: NEW
Well Report: DESC 53462 View Log Groundwater Site
Well Label: 42951
Start Card: 135690
Original Report:
Owner Well Nbr:
Company Job Nbr:
Primary Use: DOMESTIC
Complete Date: 10/11/2000
Land Owner
Name: JAY BUTLER
Company: SUN FOREST CONSTRUCTION
Address: PO BOX 2378

SUNRIVER, OR 97707
Location
(Click to Collapse...)
 
Latitude/Longitude
Latitude: 44.21260452
Longitude: -121.43011037
Horiz. Error: 200.00 ft.
Location
County: DESC
TRSQQ: WM16.00S11.00E5NESE
Tax Map:
Tax Lot: 100
Lot:
Block:
Subdivision:
Street of Well: 18005 PLANEVIEW RD BEND
WM District: 11
Surface Elev:
Well Report Mapping Tool
Tax Lots

Note: Tax lot overlay available only for a few counties.

Well Construction
(Click to Collapse...)
 
Construction
Start Date: 10/04/2000
Completed Date: 10/11/2000
Drill Method: Rotary Air
Depth of Completed Well: 365.00
Est. Depth Drilled: 365.00
Special Standards:
Seal Placed Method: OTHER - POURED DRY
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement: ft to ft
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack:
Filter Pack Material:
Filter Pack Size:
Bore Hole
RowDiameter (in)From (ft)To (ft)
1307312.000.0039.00
137538.0039.00365.00
Seal
RowMaterialFrom (ft)To (ft)AmountAmount Calc.
15698Granular Bentonite0.0039.0043.00 
Abandonment Log
No data matches search criteria.
Casing/Liner
RowCasing/LinerDiameter (in)Above Land SurfaceFrom DepthTo (ft)GaugeMaterialWeldGlueThreadShoe
Inside
Shoe
Outside
Shoe
Other
Shoe
Location
43198Liner6.00 0.00 350.00 .188 Steel  
57232Casing8.00 1.00 39.00 .250 Steel  
Temporary Casing
No data matches search criteria.
Perforations
Screens
No data matches search criteria.
Well Test
(Click to Expand...)
 
Well Test
Temperature: 51 F
Lab Analysis:
Lab Analysis Done By:
Total Dissolved Solids:
Water Quality Concerns:
Well Test
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
 
Static Water Level
Depth First Water: 335.00
Pre-Static Water Level:
Pre-Static Water Level Date:
Post-Static Water Level: 279.00
Post-Static Water Level Date: 10/11/2000
Static Water Level
RowDateFrom(ft)To(ft)SWLEst. Flow RatePSI
2399 335.00365.00279.0075.0 
Lithology
(Click to Expand...)
 
Material
RowFromToMaterialStatic Water Level
235690.003.00LOAM CLAY BROWN 
235703.0031.00LAVA BROKEN SAND RED BROWN 
2357131.0048.00BASALT 
2357248.0059.00CINDERS 
2357359.0068.00BASALT BROKEN 
2357468.0074.00CONGLOMERATE 
2357574.00170.00LAVA FRAC 
23577170.00195.00CONGLOMERATE SANDSTONE 
23579195.00212.00LAVA CREVICED 
23580212.00233.00BASALT FRAC LAYERS 
23581233.00245.00CONGLOMERATE 
23582245.00262.00BASALT 
23583262.00285.00SANDSTONE 
23584285.00305.00LAVA GRAY 
23586305.00315.00CONGLOMERATE 
23587315.00335.00BASALT/LAVA/CINDERS279.00
23588335.00352.00BASALT/FRAC LAYERS279.00
23589352.00365.00BASALT BROKEN279.00
Well Constructor
(Click to Expand...)
 
Bonded Driller Name: JACK ABBAS
Bonded Driller Company: ABBAS WELL DRILLING CO
Bonded Driller Number: 1720
Bonded Date Signed:
Unbonded Name: PECK,THOMAS R
Unbonded Company: ABBAS WELL DRILLING CO
Unbonded Number: 758
Unbonded Date Signed:
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
Comments
(Click to Expand...)
 
Comments
4 yards cement from 50' to 70'. 4 yards cement from 42' to 165'. 4 yards cement from 40' to 176'.
Documents
(Click to Expand...)
 
TitleDocument TypeSourceDownload Image
DESC 53462WELL REPORTDRILLERImage