Oregon Water Resources Department
Well Log Information System
Well Log:
JACK 54222
Main
Help
Return
Contact Us
Well Information
(Click to Collapse...)
Identification
Type of Report:
Water Well
Type of Work:
NEW
Well Report:
JACK
54222
View Log
Well Label:
45755
Start Card:
137135
Original Report:
Owner Well Nbr:
Company Job Nbr:
Primary Use:
DOMESTIC
Complete Date:
12/12/2000
Land Owner
Name:
DAVID REED
Company:
REED, GAYLE
Address:
13800 DUGGAM RD
CENTRAL POINT, OR 97502
Location
(Click to Collapse...)
Latitude/Longitude
Latitude:
42.46780000
Longitude:
-123.01333333
Horiz. Error:
99.00
ft.
Location
County:
JACK
TRSQQ:
WM36.00S3.00W1NWSW
Tax Map:
Tax Lot:
400
Lot:
Block:
Subdivision:
Street of Well:
39 SAMS CREEK RD, GOLD HILL
WM District:
13
Surface Elev:
1250.32
FT
Well Report Mapping Tool
Tax Lots
Note: Tax lot overlay available only for a few counties.
Well Construction
(Click to Collapse...)
Construction
Start Date:
12/08/2000
Completed Date:
12/12/2000
Drill Method:
Rotary Air
Depth of Completed Well:
800.00
Est. Depth Drilled:
800.00
Special Standards:
Seal Placed Method:
OTHER - POURED DRY
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement:
ft to ft
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack:
Filter Pack Material:
Filter Pack Size:
Bore Hole
Row
Diameter (in)
From (ft)
To (ft)
1
10.00
0.00
19.00
2
6.00
19.00
800.00
Seal
No data matches search criteria.
Abandonment Log
No data matches search criteria.
Casing/Liner
Row
Casing/Liner
Diameter (in)
Above Land Surface
From Depth
To (ft)
Gauge
Material
Weld
Glue
Thread
Shoe
Inside
Shoe
Outside
Shoe
Other
Shoe
Location
44142
Casing
6.00
1.00
19.00
.250
Steel
●
19.00
Temporary Casing
No data matches search criteria.
Perforations
No data matches search criteria.
Screens
No data matches search criteria.
Well Test
(Click to Expand...)
Well Test
Temperature:
57 F
Lab Analysis:
Lab Analysis Done By:
Total Dissolved Solids:
Water Quality Concerns:
Well Test
Test Type
Yield (gpm)
Drawdown
Drill Stem/
Pump Depth
Duration (hr)
Calculated Specific Capacity (gpm/ft)
Air
4.0
800
1.0
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
Static Water Level
Depth First Water:
160.00
Pre-Static Water Level:
Pre-Static Water Level Date:
Post-Static Water Level:
36.00
Post-Static Water Level Date:
12/12/2000
Static Water Level
Row
Date
From(ft)
To(ft)
SWL
Est. Flow Rate
PSI
1
12/12/2000
160.00
165.00
36.00
0.5
2
12/12/2000
360.00
368.00
36.00
0.5
3
12/12/2000
641.00
648.00
36.00
1.0
4
12/12/2000
755.00
760.00
36.00
2.0
Lithology
(Click to Expand...)
Material
Row
From
To
Material
Static Water Level
1
0.00
2.00
SOIL BROWN
2
2.00
800.00
BASALT GRAY
36.00
Well Constructor
(Click to Expand...)
Bonded Driller Name:
SIG MILKOWSKI
Bonded Driller Company:
GRIBBLE WELL DRILLING
Bonded Driller Number:
705
Bonded Date Signed:
12/29/2000
Unbonded Name:
Unbonded Company:
Unbonded Number:
Unbonded Date Signed:
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
No data matches search criteria.
Documents
(Click to Expand...)
Title
Document Type
Source
Download Image
JACK 54222
WELL REPORT
DRILLER
Image