Oregon Water Resources Department
Well Log Information System
Well Log:
DESC 10060
Main
Help
Return
Contact Us
Well Information
(Click to Collapse...)
Identification
Type of Report:
Water Well
Type of Work:
NEW
Well Report:
DESC
10060
View Log
Groundwater Site
Well Label:
91653
Start Card:
70924
Original Report:
Owner Well Nbr:
Company Job Nbr:
Primary Use:
INDUSTRIAL
Complete Date:
07/28/1995
Land Owner
Name:
Company:
CALIFORNIA ENERGY CO. INC.
Address:
900 N HERITAGE DR BUILDING D
RIDGECREST, CA 93555
Location
(Click to Collapse...)
Latitude/Longitude
Latitude:
43.73756190
Longitude:
-121.30207733
Horiz. Error:
15.00
ft.
Location
County:
DESC
TRSQQ:
WM21.00S12.00E21NESW
Tax Map:
Tax Lot:
100
Lot:
Block:
Subdivision:
Street of Well:
NATIONAL FOREST
WM District:
11
Surface Elev:
Well Report Mapping Tool
Tax Lots
Note: Tax lot overlay available only for a few counties.
Well Construction
(Click to Collapse...)
Construction
Start Date:
05/01/1995
Completed Date:
07/28/1995
Drill Method:
Rotary Air
Depth of Completed Well:
805.00
Est. Depth Drilled:
805.00
Special Standards:
Seal Placed Method:
C
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement:
ft to ft
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack:
Filter Pack Material:
Filter Pack Size:
Bore Hole
Row
Diameter (in)
From (ft)
To (ft)
1
16.50
0.00
203.00
2
9.88
203.00
806.00
Seal
No data matches search criteria.
Abandonment Log
No data matches search criteria.
Casing/Liner
Row
Casing/Liner
Diameter (in)
Above Land Surface
From Depth
To (ft)
Gauge
Material
Weld
Glue
Thread
Shoe
Inside
Shoe
Outside
Shoe
Other
Shoe
Location
49506
Casing
10.00
●
2.00
203.00
.250
Steel
●
49507
Liner
7.00
●
2.00
793.00
0.188 - Gauge
Steel
●
Temporary Casing
No data matches search criteria.
Perforations
Row
Method
Material
Casing/Liner
Diameter (in)
From (ft)
To (ft)
Perforation
Size
Screen/Slot
Size Width
Slot Length
Nbr of Slots
1
TORCH
Liner
7.00
693.00
773.00
0.250
6.000
144
Screens
No data matches search criteria.
Well Test
(Click to Expand...)
Well Test
Temperature:
56 F
Lab Analysis:
Lab Analysis Done By:
Total Dissolved Solids:
Water Quality Concerns:
Well Test
Test Type
Yield (gpm)
Drawdown
Drill Stem/
Pump Depth
Duration (hr)
Calculated Specific Capacity (gpm/ft)
Air
50.0
665.00
1.0
Air
200.0
790.00
1.0
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
Static Water Level
Depth First Water:
782.00
Pre-Static Water Level:
Pre-Static Water Level Date:
Post-Static Water Level:
555.00
Post-Static Water Level Date:
07/08/1995
Static Water Level
Row
Date
From(ft)
To(ft)
SWL
Est. Flow Rate
PSI
1
782.00
805.00
656.00
200.0
Lithology
(Click to Expand...)
Material
Row
From
To
Material
Static Water Level
1
0.00
10.00
SOIL & PUMICE
2
10.00
82.00
BROKEN GREY ROCK
3
82.00
205.00
GREY ROCK
4
205.00
374.00
BROKEN CAVING GREY ROCK
5
374.00
433.00
HARD GREY ROCK
6
433.00
570.00
RED ROCK
7
570.00
585.00
HARD RED & GREY ROCK
8
585.00
661.00
HARD GREY ROCK
9
661.00
729.00
RED ROCK
10
729.00
782.00
HARD GREY
11
782.00
793.00
RED CINDERS
555.00
12
793.00
805.00
BROKEN BROWN ROCK
555.00
Well Constructor
(Click to Expand...)
Bonded Driller Name:
ROGER CHANCELLOR
Bonded Driller Company:
CHANCELLOR DRILLING AND PUMP
Bonded Driller Number:
693
Bonded Date Signed:
08/01/1995
Unbonded Name:
Unbonded Company:
Unbonded Number:
Unbonded Date Signed:
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
No data matches search criteria.
Documents
(Click to Expand...)
Title
Document Type
Source
Download Image
Received Date
DESC 10060
WELL REPORT
DRILLER
Image
8/11/1995