Oregon Water Resources Department
Well Log Information System
Well Log:
DESC 55228
Main
Help
Return
Contact Us
Well Information
(Click to Collapse...)
Identification
Type of Report:
Water Well
Type of Work:
DEEPENING
Well Report:
DESC
55228
View Log
Groundwater Site
Well Label:
64220
Start Card:
149133
Original Report:
DESC
285
View Original Log
Owner Well Nbr:
Company Job Nbr:
Primary Use:
IRRIGATION
Complete Date:
02/28/2003
Land Owner
Name:
ARRON BOER
Company:
Address:
70395 LOWER BRIDGE
TERREBONNE, OR 97760
Location
(Click to Collapse...)
Latitude/Longitude
Latitude:
44.33560041
Longitude:
-121.30984765
Horiz. Error:
100.00
ft.
Location
County:
DESC
TRSQQ:
WM14.00S12.00E21SWSW
Tax Map:
Tax Lot:
2600
Lot:
Block:
Subdivision:
Street of Well:
BUCKHORN RD TERREBONNE
WM District:
11
Surface Elev:
Well Report Mapping Tool
Tax Lots
Note: Tax lot overlay available only for a few counties.
Well Construction
(Click to Collapse...)
Construction
Start Date:
02/18/2003
Completed Date:
02/28/2003
Drill Method:
Cable
Depth of Completed Well:
203.00
Est. Depth Drilled:
203.00
Special Standards:
Seal Placed Method:
OTHER - DID NOT DISTURB
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement:
ft to ft
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack:
Filter Pack Material:
Filter Pack Size:
Bore Hole
Row
Diameter (in)
From (ft)
To (ft)
14186
16.00
165.00
203.00
Seal
No data matches search criteria.
Abandonment Log
No data matches search criteria.
Casing/Liner
No data matches search criteria.
Temporary Casing
No data matches search criteria.
Perforations
No data matches search criteria.
Screens
No data matches search criteria.
Well Test
(Click to Expand...)
Well Test
Temperature:
53 F
Lab Analysis:
Lab Analysis Done By:
Total Dissolved Solids:
Water Quality Concerns:
Well Test
Test Type
Yield (gpm)
Drawdown
Drill Stem/
Pump Depth
Duration (hr)
Calculated Specific Capacity (gpm/ft)
Bailer
50.0
0.0
1.0
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
Static Water Level
Depth First Water:
165.00
Pre-Static Water Level:
Pre-Static Water Level Date:
Post-Static Water Level:
115.00
Post-Static Water Level Date:
02/28/2003
Static Water Level
Row
Date
From(ft)
To(ft)
SWL
Est. Flow Rate
PSI
1
2/28/2003
165.00
190.00
115.00
50.0
Lithology
(Click to Expand...)
Material
Row
From
To
Material
Static Water Level
26232
165.00
175.00
SAND
26233
175.00
189.00
LAVA RED
26234
189.00
203.00
LAVA GRAY
115.00
Well Constructor
(Click to Expand...)
Bonded Driller Name:
JACK ABBAS
Bonded Driller Company:
ABBAS WELL DRILLING CO
Bonded Driller Number:
1720
Bonded Date Signed:
Unbonded Name:
PECK,THOMAS R
Unbonded Company:
ABBAS WELL DRILLING CO
Unbonded Number:
758
Unbonded Date Signed:
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
Comments
(Click to Expand...)
No data matches search criteria.
Documents
(Click to Expand...)
Title
Document Type
Source
Download Image
DESC 55228
WELL REPORT
DRILLER
Image