Oregon Water Resources Department
Well Log Information System
Well Log:
UMAT 55912
Main
Help
Return
Contact Us
Well Information
(Click to Collapse...)
Identification
Type of Report:
Water Well
Type of Work:
NEW
Well Report:
UMAT
55912
View Log
Groundwater Site
Well Label:
33891
Start Card:
143408
Original Report:
Owner Well Nbr:
4
Company Job Nbr:
Primary Use:
DOMESTIC
Complete Date:
12/03/2001
Land Owner
Name:
Company:
A BAR G RANCH
Address:
PO BOX 2003
DALE, OR 97880
Location
(Click to Collapse...)
Latitude/Longitude
Latitude:
45.00575700
Longitude:
-118.86323400
Horiz. Error:
100.00
ft.
Location
County:
UMAT
TRSQQ:
WM6.00N32.00ESWSW
Tax Map:
Tax Lot:
2603
Lot:
Block:
Subdivision:
Street of Well:
RD 55
WM District:
4
Surface Elev:
Well Report Mapping Tool
Tax Lots
Note: Tax lot overlay available only for a few counties.
Well Construction
(Click to Collapse...)
Construction
Start Date:
11/30/2001
Completed Date:
12/03/2001
Drill Method:
Rotary Air
Depth of Completed Well:
125.00
Est. Depth Drilled:
125.00
Special Standards:
Seal Placed Method:
OTHER - POURED IN
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement:
ft to ft
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack:
Filter Pack Material:
Filter Pack Size:
Bore Hole
Row
Diameter (in)
From (ft)
To (ft)
1
12.00
0.00
20.00
2
8.00
20.00
125.00
Seal
Row
Material
From (ft)
To (ft)
Amount
Amount Calc.
1
Other
0.00
20.00
17.00
Abandonment Log
No data matches search criteria.
Casing/Liner
Row
Casing/Liner
Diameter (in)
Above Land Surface
From Depth
To (ft)
Gauge
Material
Weld
Glue
Thread
Shoe
Inside
Shoe
Outside
Shoe
Other
Shoe
Location
1
Casing
8.00
●
2.00
125.00
.250
Steel
●
●
125.00
Temporary Casing
No data matches search criteria.
Perforations
No data matches search criteria.
Screens
No data matches search criteria.
Well Test
(Click to Expand...)
Well Test
Temperature:
57 F
Lab Analysis:
Lab Analysis Done By:
Total Dissolved Solids:
Water Quality Concerns:
Well Test
Test Type
Yield (gpm)
Drawdown
Drill Stem/
Pump Depth
Duration (hr)
Calculated Specific Capacity (gpm/ft)
Air
30.0
124.00
1.0
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
Static Water Level
Depth First Water:
112.00
Pre-Static Water Level:
Pre-Static Water Level Date:
Post-Static Water Level:
105.00
Post-Static Water Level Date:
12/05/2001
Static Water Level
Row
Date
From(ft)
To(ft)
SWL
Est. Flow Rate
PSI
1
112.00
113.00
105.00
30.0
Lithology
(Click to Expand...)
Material
Row
From
To
Material
Static Water Level
1
0.00
2.00
TOP SOIL
2
2.00
15.00
BROWN CLAY
3
15.00
25.00
WHITE CLAY
4
25.00
42.00
BROKEN BASALT
5
42.00
51.00
HARD BLACK BASALT
6
51.00
62.00
VESICULAR BLACK BASALT
7
62.00
69.00
HARD BLACK BASALT
8
69.00
79.00
VESICULAR BASALT
9
79.00
89.00
HARD BLACK BASALT
10
89.00
91.00
BROKEN BASALT
11
91.00
112.00
HARD BASALT
12
112.00
113.00
FRACTURED AND CRACKED BASALT (WATER)
105.00
13
113.00
125.00
HARD BASALT
Well Constructor
(Click to Expand...)
Bonded Driller Name:
LYLE AMOS
Bonded Driller Company:
TRIPLE A DRILLING
Bonded Driller Number:
1719
Bonded Date Signed:
12/06/2001
Unbonded Name:
Unbonded Company:
Unbonded Number:
Unbonded Date Signed:
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
Comments
(Click to Expand...)
Comments
SUGGEST PUMP TO BE SAT RIGHT N BOTTOM OF HOLE. WATER HAS NO PRESSURE. SEEMS TO BE FLOWING THROUGH.
Documents
(Click to Expand...)
Title
Document Type
Source
Download Image
Received Date
UMAT 55912
WELL REPORT
DRILLER
Image
2/20/2007