Oregon Water Resources Department
Well Log Information System
Well Log:
WHEE 50335
Main
Help
Return
Contact Us
Well Information
(Click to Collapse...)
Identification
Type of Report:
Water Well
Type of Work:
NEW
Well Report:
WHEE
50335
View Log
Groundwater Site
Well Label:
91135
Start Card:
1001790
Original Report:
Owner Well Nbr:
#9
Company Job Nbr:
Primary Use:
OTHER - TEST HOLE
Complete Date:
08/14/2007
Land Owner
Name:
CASEY SAFRENO
Company:
4DSD,LLC
Address:
175 PHILLIP RD
WOODSIDE, CA 94062
Location
(Click to Collapse...)
Latitude/Longitude
Latitude:
44.61498333
Longitude:
-119.86136667
Horiz. Error:
99.00
ft.
Location
County:
WHEE
TRSQQ:
WM11.00S24.00E27NESW
Tax Map:
Tax Lot:
501
Lot:
Block:
Subdivision:
Street of Well:
NON ASSIGNED WELL #9
WM District:
4
Surface Elev:
Well Report Mapping Tool
Tax Lots
Note: Tax lot overlay available only for a few counties.
Well Construction
(Click to Collapse...)
Construction
Start Date:
08/14/2007
Completed Date:
08/14/2007
Drill Method:
Rotary Air
Depth of Completed Well:
470.00
Est. Depth Drilled:
470.00
Special Standards:
Seal Placed Method:
OTHER - POURED DRY
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement:
ft to ft
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack:
Filter Pack Material:
Filter Pack Size:
Bore Hole
Row
Diameter (in)
From (ft)
To (ft)
1
12.00
0.00
18.50
2
8.00
18.50
470.00
Seal
Row
Material
From (ft)
To (ft)
Amount
Amount Calc.
1
Bentonite
0.00
18.50
11.00
Abandonment Log
No data matches search criteria.
Casing/Liner
Row
Casing/Liner
Diameter (in)
Above Land Surface
From Depth
To (ft)
Gauge
Material
Weld
Glue
Thread
Shoe
Inside
Shoe
Outside
Shoe
Other
Shoe
Location
1
Casing
8.00
●
1.50
18.50
.250
ST
Temporary Casing
No data matches search criteria.
Perforations
No data matches search criteria.
Screens
No data matches search criteria.
Well Test
(Click to Expand...)
Well Test
Temperature:
62 F
Lab Analysis:
Lab Analysis Done By:
Total Dissolved Solids:
Water Quality Concerns:
Well Test
Test Type
Yield (gpm)
Drawdown
Drill Stem/
Pump Depth
Duration (hr)
Calculated Specific Capacity (gpm/ft)
Air
50.0
470
1.0
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
Static Water Level
Depth First Water:
205.00
Pre-Static Water Level:
Pre-Static Water Level Date:
Post-Static Water Level:
17.00
Post-Static Water Level Date:
08/14/2007
Static Water Level
Row
Date
From(ft)
To(ft)
SWL
Est. Flow Rate
PSI
1
8/14/2007
205.00
230.00
17.00
15.0
2
8/14/2007
445.00
470.00
17.00
35.0
Lithology
(Click to Expand...)
Material
Row
From
To
Material
Static Water Level
1
0.00
5.00
BROWN CLAY
2
5.00
104.00
BROWN CLAY STONE
3
104.00
113.00
GRAY CLAY STONE
4
113.00
125.00
BROWN CLAY AND GRAVELS
5
125.00
305.00
GRAY LAVA FRACTURED
6
305.00
326.00
GRAY CLAY STONE
7
326.00
470.00
GRAY FRACTURED LAYERS
Well Constructor
(Click to Expand...)
Bonded Driller Name:
JACK ABBAS
Bonded Driller Company:
ABBAS WELL DRILLING CO
Bonded Driller Number:
1720
Bonded Date Signed:
08/20/2007
Unbonded Name:
PECK,ALLEN R
Unbonded Company:
ABBAS WELL DRILLING CO
Unbonded Number:
1831
Unbonded Date Signed:
08/20/2007
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
Comments
(Click to Expand...)
Comments
Documents
(Click to Expand...)
Title
Document Type
Source
Download Image
WHEE 50335
WELL REPORT
DRILLER
Image