Well Information
(Click to Collapse...)
 
Identification
Type of Report: Water Well
Type of Work: ALTERATION
Well Report: UMAT 56680 View Log Groundwater Site
Well Label: 102128
Start Card: 202667
Original Report: UMAT 56541 View Original Log
Owner Well Nbr:
Company Job Nbr:
Primary Use: INDUSTRIAL
Complete Date: 09/09/2010
Land Owner
Name:
Company: MILTON FREEWATER UNIFIED SCHOOL DISTRICT 7
Address: 1020 S MILL ST

MILTON FREEWATER, OR 97862
Location
(Click to Collapse...)
 
Latitude/Longitude
Latitude: 45.98073000
Longitude: -118.40224000
Horiz. Error: 17.00 ft.
Location
County: UMAT
TRSQQ: WM6.00N35.00E23NWSE
Tax Map:
Tax Lot: 1500
Lot:
Block:
Subdivision:
Street of Well: 53445 W FERNDALE RD
WM District: 23
Surface Elev:
Well Report Mapping Tool
Tax Lots

Note: Tax lot overlay available only for a few counties.

Well Construction
(Click to Collapse...)
 
Construction
Start Date: 08/17/2010
Completed Date: 09/09/2010
Drill Method: Rotary Air
Depth of Completed Well: 500.00
Est. Depth Drilled: 500.00
Special Standards:
Seal Placed Method: A , C
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement: ft to ft
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack: 420.00 ft to 500.00 ft
Filter Pack Material: PEA GRAVEL
Filter Pack Size:
Bore Hole
No data matches search criteria.
Seal
No data matches search criteria.
Abandonment Log
No data matches search criteria.
Casing/Liner
Temporary Casing
No data matches search criteria.
Perforations
Screens
No data matches search criteria.
Well Test
(Click to Expand...)
 
Well Test
Temperature: 58 F
Lab Analysis:
Lab Analysis Done By:
Total Dissolved Solids:
Water Quality Concerns:
Well Test
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
 
Static Water Level
Depth First Water:
Pre-Static Water Level:
Pre-Static Water Level Date:
Post-Static Water Level: 97.00
Post-Static Water Level Date: 09/09/2010
Static Water Level
No data matches search criteria.
Material
No data matches search criteria.
Well Constructor
(Click to Expand...)
 
Bonded Driller Name: PATRICK WALLACE
Bonded Driller Company: WALLACE DRILLING
Bonded Driller Number: 1218
Bonded Date Signed: 09/28/2010
Unbonded Name:
Unbonded Company:
Unbonded Number:
Unbonded Date Signed:
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
Comments
(Click to Expand...)
 
Comments
Reconstruction procedure: Perforated 8" casing from 60 ft to 413 ft. Oregon Water Resources ran camera to examine and approve perforations. Placed pea gravel from bottom of hole, 500 ft to 420ft. Installed casing from +2 to 420. Ran 2" grout shoe at 420. Pumped 121 sacks thru grout shoe, sealing from 126 to 420, method A. Returned 36 hrs later, drilled cement show out and cleaned hole to bottom 500 ft. Pumped 196 sacks cement between 6" and 8", filling to ground surface, 0 to 126. Method C.
Reconstruction procedure page 2: Over drilled the 8" casing with 12" casing down to 30 ft. Pressure grouted from 30 ft bask to land surface with 18 sacks cement, method c. Special standards granted 8/13/2010. Special standards granted 9/7/2010.
Documents
(Click to Expand...)
 
TitleDocument TypeSourceDownload ImageReceived Date
ARCHIVE DOCUMENTOTHERARCHIVEImage9/29/2010
UMAT 56680WELL REPORTDRILLERImage9/29/2010