Oregon Water Resources Department
Well Log Information System
Well Log:
HARN 51950
Main
Help
Return
Contact Us
Well Information
(Click to Collapse...)
Identification
Type of Report:
Water Well
Type of Work:
NEW
Well Report:
HARN
51950
View Log
Groundwater Site
Well Label:
111163
Start Card:
1020081
Original Report:
Owner Well Nbr:
Company Job Nbr:
Primary Use:
IRRIGATION
Complete Date:
06/07/2013
Land Owner
Name:
DON NIENKE
Company:
Address:
21765 SW 78TH AVE
TUALATIN, OR 97062
Location
(Click to Collapse...)
Latitude/Longitude
Latitude:
43.18203000
Longitude:
-118.96461000
Horiz. Error:
25.00
ft.
Location
County:
HARN
TRSQQ:
WM27.00S30.00E35SESW
Tax Map:
Tax Lot:
500
Lot:
Block:
Subdivision:
Street of Well:
53750 HWY 205, PRINCETON, OR. 97721
WM District:
10
Surface Elev:
Well Report Mapping Tool
Tax Lots
Note: Tax lot overlay available only for a few counties.
Well Construction
(Click to Collapse...)
Construction
Start Date:
06/03/2013
Completed Date:
06/07/2013
Drill Method:
Rotary Air
Depth of Completed Well:
570.00
Est. Depth Drilled:
570.00
Special Standards:
Seal Placed Method:
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement:
ft to ft
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack:
Filter Pack Material:
Filter Pack Size:
Bore Hole
Row
Diameter (in)
From (ft)
To (ft)
1
16.00
0.00
18.00
2
12.00
18.00
570.00
Seal
Row
Material
From (ft)
To (ft)
Amount
Amount Calc.
1
Bentonite Chips
0.00
18.00
15.00
Abandonment Log
No data matches search criteria.
Casing/Liner
Row
Casing/Liner
Diameter (in)
Above Land Surface
From Depth
To (ft)
Gauge
Material
Weld
Glue
Thread
Shoe
Inside
Shoe
Outside
Shoe
Other
Shoe
Location
1
Casing
12.00
●
1.00
20.00
.250
Steel
Temporary Casing
No data matches search criteria.
Perforations
No data matches search criteria.
Screens
No data matches search criteria.
Well Test
(Click to Expand...)
Well Test
Temperature:
65 F
Lab Analysis:
Lab Analysis Done By:
Total Dissolved Solids:
Water Quality Concerns:
Well Test
Test Type
Yield (gpm)
Drawdown
Drill Stem/
Pump Depth
Duration (hr)
Calculated Specific Capacity (gpm/ft)
Air
700.0
570.00
1.0
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
Static Water Level
Depth First Water:
425.00
Pre-Static Water Level:
Pre-Static Water Level Date:
Post-Static Water Level:
60.00
Post-Static Water Level Date:
06/07/2013
Static Water Level
Row
Date
From(ft)
To(ft)
SWL
Est. Flow Rate
PSI
1
6/7/2013
425.00
570.00
60.00
700.0
Lithology
(Click to Expand...)
Material
Row
From
To
Material
Static Water Level
1
0.00
1.00
TOPSOIL CLAY COBBLES
2
1.00
11.00
ROCK BASALT BLACK
3
11.00
42.00
CLAY YELLOW
4
42.00
50.00
CLAY RED
5
50.00
85.00
CLAY YELLOW
6
85.00
425.00
CLAY GREY
7
425.00
530.00
CLAYSTONE GREY & GREEN
8
530.00
570.00
SANDSTONE GREY
Well Constructor
(Click to Expand...)
Bonded Driller Name:
TIMOTHY K RILEY
Bonded Driller Company:
WESTERN DRILLING CO
Bonded Driller Number:
1424
Bonded Date Signed:
06/26/2013
Unbonded Name:
Unbonded Company:
Unbonded Number:
Unbonded Date Signed:
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
No data matches search criteria.
Documents
(Click to Expand...)
Title
Document Type
Source
Download Image
Received Date
HARN 51950
WELL REPORT
DRILLER
Image
6/26/2013