Well Information
(Click to Collapse...)
 
Identification
Type of Report: Water Well
Type of Work: NEW
Well Report: HARN 52011 View Log Groundwater Site
Well Label: 113430
Start Card: 1021619
Original Report:
Owner Well Nbr: WELL #3
Company Job Nbr:
Primary Use: IRRIGATION
Complete Date: 12/02/2013
Land Owner
Name:
Company: DEPARTMENT OF STATE LANDS
Address: 1645 NE FORBES RD, STE 112

BEND, OR 97701
Location
(Click to Collapse...)
 
Latitude/Longitude
Latitude: 43.55460000
Longitude: -118.63409000
Horiz. Error: 25.00 ft.
Location
County: HARN
TRSQQ: WM23.00S33.00E22SESE
Tax Map:
Tax Lot: 100
Lot:
Block:
Subdivision:
Street of Well: CRANE BUCHANAN RD, CRANE, OR 97732
WM District: 10
Surface Elev:
Well Report Mapping Tool
Tax Lots

Note: Tax lot overlay available only for a few counties.

Well Construction
(Click to Collapse...)
 
Construction
Start Date: 11/16/2013
Completed Date: 12/02/2013
Drill Method: Rotary Air
Depth of Completed Well: 241.00
Est. Depth Drilled: 241.00
Special Standards:
Seal Placed Method:
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement: ft to ft
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack:
Filter Pack Material:
Filter Pack Size:
Bore Hole
RowDiameter (in)From (ft)To (ft)
118.000.0020.00
214.0020.00205.00
312.00205.00241.00
Seal
RowMaterialFrom (ft)To (ft)AmountAmount Calc.
1Bentonite Chips0.0020.0038.00 
Abandonment Log
No data matches search criteria.
Casing/Liner
RowCasing/LinerDiameter (in)Above Land SurfaceFrom DepthTo (ft)GaugeMaterialWeldGlueThreadShoe
Inside
Shoe
Outside
Shoe
Other
Shoe
Location
1Casing14.00 1.00 205.00 .250 Steel  
2Liner12.00 194.00 241.00 .250 Steel  
Temporary Casing
No data matches search criteria.
Perforations
Screens
No data matches search criteria.
Well Test
(Click to Expand...)
 
Well Test
Temperature: 60 F
Lab Analysis:
Lab Analysis Done By:
Total Dissolved Solids:
Water Quality Concerns:
Well Test
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
 
Static Water Level
Depth First Water: 23.00
Pre-Static Water Level:
Pre-Static Water Level Date:
Post-Static Water Level: 20.00
Post-Static Water Level Date: 12/02/2013
Static Water Level
RowDateFrom(ft)To(ft)SWLEst. Flow RatePSI
112/2/201323.00237.0020.00900.0 
Lithology
(Click to Expand...)
 
Material
RowFromToMaterialStatic Water Level
10.002.00SILTY LOAM TOPSOIL 
22.0023.00CLAY BROWN 
323.0047.00CLAY GREY 
447.00115.00SAND MEDIUM BLACK BLUE 
5115.00202.00FINE SAND BLACK 
6202.00218.00GRAVEL MEDIUM 
7218.00237.00GRAVEL MEDIUM WITH CLAY BALLS 
8237.00241.00CLAY GREY 
Well Constructor
(Click to Expand...)
 
Bonded Driller Name: TIMOTHY K RILEY
Bonded Driller Company: WESTERN DRILLING CO
Bonded Driller Number: 1424
Bonded Date Signed: 12/11/2013
Unbonded Name:
Unbonded Company:
Unbonded Number:
Unbonded Date Signed:
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
No data matches search criteria.
Documents
(Click to Expand...)
 
TitleDocument TypeSourceDownload Image
HARN 52011WELL REPORTDRILLERImage