Oregon Water Resources Department
Well Log Information System
Well Log:
HARN 52056
Main
Help
Return
Contact Us
Well Information
(Click to Collapse...)
Identification
Type of Report:
Water Well
Type of Work:
NEW
Well Report:
HARN
52056
View Log
Groundwater Site
Well Label:
109975
Start Card:
1021659
Original Report:
Owner Well Nbr:
Company Job Nbr:
Primary Use:
IRRIGATION
Complete Date:
11/18/2013
Land Owner
Name:
JIM GILMOUR
Company:
Address:
30427 STELLMACHER DR
ALBANY, OR 97321-9402
Location
(Click to Collapse...)
Latitude/Longitude
Latitude:
43.25753000
Longitude:
-118.55072600
Horiz. Error:
99.00
ft.
Location
County:
HARN
TRSQQ:
WM27.00S34.00E5SWSE
Tax Map:
Tax Lot:
600
Lot:
Block:
Subdivision:
Street of Well:
APPROX 200 YDS FROM MM40 ON HWY 78, PRINCETON, OR
WM District:
10
Surface Elev:
Well Report Mapping Tool
Tax Lots
Note: Tax lot overlay available only for a few counties.
Well Construction
(Click to Collapse...)
Construction
Start Date:
11/11/2013
Completed Date:
11/18/2013
Drill Method:
Rotary Air
Depth of Completed Well:
610.00
Est. Depth Drilled:
610.00
Special Standards:
Seal Placed Method:
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement:
ft to ft
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack:
Filter Pack Material:
Filter Pack Size:
Bore Hole
Row
Diameter (in)
From (ft)
To (ft)
1
16.00
0.00
45.00
2
12.00
45.00
162.00
3
14.00
162.00
175.00
4
12.00
175.00
220.00
5
10.00
220.00
610.00
Seal
Row
Material
From (ft)
To (ft)
Amount
Amount Calc.
1
Bentonite Chips
0.00
45.00
37.00
2
Cement
162.00
170.00
8.00
Abandonment Log
No data matches search criteria.
Casing/Liner
Row
Casing/Liner
Diameter (in)
Above Land Surface
From Depth
To (ft)
Gauge
Material
Weld
Glue
Thread
Shoe
Inside
Shoe
Outside
Shoe
Other
Shoe
Location
1
Casing
12.00
●
3.00
175.00
.250
Steel
●
Temporary Casing
No data matches search criteria.
Perforations
No data matches search criteria.
Screens
No data matches search criteria.
Well Test
(Click to Expand...)
Well Test
Temperature:
58 F
Lab Analysis:
Lab Analysis Done By:
Total Dissolved Solids:
Water Quality Concerns:
Well Test
Test Type
Yield (gpm)
Drawdown
Drill Stem/
Pump Depth
Duration (hr)
Calculated Specific Capacity (gpm/ft)
Air
1000.0
600
2.0
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
Static Water Level
Depth First Water:
110.00
Pre-Static Water Level:
Pre-Static Water Level Date:
Post-Static Water Level:
20.00
Post-Static Water Level Date:
11/18/2013
Static Water Level
Row
Date
From(ft)
To(ft)
SWL
Est. Flow Rate
PSI
1
11/12/2013
110.00
162.00
25.00
50.0
2
11/15/2013
241.00
610.00
20.00
1000.0
Lithology
(Click to Expand...)
Material
Row
From
To
Material
Static Water Level
1
0.00
4.00
SANDY CLAY BROWN
2
4.00
34.00
CLAY BROWN
3
34.00
110.00
CLAY BLUE
4
110.00
115.00
QUARTZ SAND BLACK & WHITE
5
115.00
162.00
CLAY BLUE WITH CRACKS OF SAND
6
162.00
241.00
BASALT BLACK
7
241.00
610.00
FRACTURED BASALT BLACK
Well Constructor
(Click to Expand...)
Bonded Driller Name:
SAM P KINGREY
Bonded Driller Company:
DOWN RIGHT DRILLING & PUMP INC
Bonded Driller Number:
1899
Bonded Date Signed:
06/10/2014
Unbonded Name:
HACKETT,TONY
Unbonded Company:
DOWN RIGHT DRILLING & PUMP INC
Unbonded Number:
1896
Unbonded Date Signed:
11/20/2013
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
No data matches search criteria.
Documents
(Click to Expand...)
Title
Document Type
Source
Download Image
HARN 52056
EXEMPT USE MAP
DRILLER
Image
HARN 52056
WELL REPORT
DRILLER
Image