Oregon Water Resources Department
Well Log Information System
Well Log:
HARN 52081
Main
Help
Return
Contact Us
Well Information
(Click to Collapse...)
Identification
Type of Report:
Water Well
Type of Work:
NEW
Well Report:
HARN
52081
View Log
Groundwater Site
Well Label:
113545
Start Card:
1023597
Original Report:
Owner Well Nbr:
Company Job Nbr:
Primary Use:
LIVESTOCK
Complete Date:
07/09/2014
Land Owner
Name:
B.M. HANSON
Company:
BROKEN HOBBLE RANCH
Address:
9350 GLOW
INDEPENDENCE, OR 97351
Location
(Click to Collapse...)
Latitude/Longitude
Latitude:
43.75923000
Longitude:
-118.46130000
Horiz. Error:
99.00
ft.
Location
County:
HARN
TRSQQ:
WM21.00S35.00E7NESW
Tax Map:
Tax Lot:
497
Lot:
Block:
Subdivision:
Street of Well:
9350 GLOW INDEPENDENCE, OR, , MILE POST 167 HWY 20
WM District:
10
Surface Elev:
Well Report Mapping Tool
Tax Lots
Note: Tax lot overlay available only for a few counties.
Well Construction
(Click to Collapse...)
Construction
Start Date:
07/07/2014
Completed Date:
07/09/2014
Drill Method:
Rotary Air
Depth of Completed Well:
500.00
Est. Depth Drilled:
500.00
Special Standards:
Seal Placed Method:
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement:
ft to ft
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack:
Filter Pack Material:
Filter Pack Size:
Bore Hole
Row
Diameter (in)
From (ft)
To (ft)
1
12.00
0.00
40.00
2
8.00
40.00
500.00
Seal
Row
Material
From (ft)
To (ft)
Amount
Amount Calc.
1
Bentonite
0.00
40.00
29.00
Abandonment Log
No data matches search criteria.
Casing/Liner
Row
Casing/Liner
Diameter (in)
Above Land Surface
From Depth
To (ft)
Gauge
Material
Weld
Glue
Thread
Shoe
Inside
Shoe
Outside
Shoe
Other
Shoe
Location
1
Casing
8.00
●
3.00
98.00
.250
Steel
●
●
98.00
Temporary Casing
No data matches search criteria.
Perforations
No data matches search criteria.
Screens
No data matches search criteria.
Well Test
(Click to Expand...)
Well Test
Temperature:
58 F
Lab Analysis:
Lab Analysis Done By:
Total Dissolved Solids:
Water Quality Concerns:
Well Test
Test Type
Yield (gpm)
Drawdown
Drill Stem/
Pump Depth
Duration (hr)
Calculated Specific Capacity (gpm/ft)
Pump
350.0
225.0
315.00
24.0
1.56
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
Static Water Level
Depth First Water:
22.00
Pre-Static Water Level:
Pre-Static Water Level Date:
Post-Static Water Level:
Post-Static Water Level Date:
Static Water Level
Row
Date
From(ft)
To(ft)
SWL
Est. Flow Rate
PSI
1
7/7/2014
22.00
24.00
22.00
2.0
2
7/9/2014
387.00
500.00
-6.90
35.0
3.000
Lithology
(Click to Expand...)
Material
Row
From
To
Material
Static Water Level
1
0.00
1.00
TOP SOIL SANDY
2
1.00
9.00
WHITE HARD CLAY
3
9.00
22.00
BROWN SOFT CLAY
4
22.00
24.00
SMALL SAND & GRAVEL
5
24.00
387.00
BROWN CLAY HARD
6
387.00
500.00
BLACK FRACTURED BASALT
Well Constructor
(Click to Expand...)
Bonded Driller Name:
SAM P KINGREY
Bonded Driller Company:
DOWN RIGHT DRILLING & PUMP INC
Bonded Driller Number:
1899
Bonded Date Signed:
07/30/2014
Unbonded Name:
HACKETT,TONY
Unbonded Company:
DOWN RIGHT DRILLING & PUMP INC
Unbonded Number:
1896
Unbonded Date Signed:
07/28/2014
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
No data matches search criteria.
Documents
(Click to Expand...)
Title
Document Type
Source
Download Image
Received Date
HARN 52081
WELL REPORT
DRILLER
Image
7/30/2014