Well Information
(Click to Collapse...)
 
Identification
Type of Report: Water Well
Type of Work: DEEPENING
Well Report: HARN 52202 View Log Groundwater Site
Well Label: 113430
Start Card: 1026186
Original Report: HARN 52011 View Original Log
Owner Well Nbr:
Company Job Nbr:
Primary Use: IRRIGATION
Complete Date: 05/23/2015
Land Owner
Name:
Company: DEPARTMENT OF STATE LANDS SUITE 112
Address: 1645 NE FORBES

BEND, OR 97701
Location
(Click to Collapse...)
 
Latitude/Longitude
Latitude: 43.55460000
Longitude: -118.63409000
Horiz. Error: 25.00 ft.
Location
County: HARN
TRSQQ: WM23.00S33.00E20NWSE
Tax Map:
Tax Lot: 100
Lot:
Block:
Subdivision:
Street of Well: CRANE BUCHANAN ROAD
WM District: 10
Surface Elev:
Well Report Mapping Tool
Tax Lots

Note: Tax lot overlay available only for a few counties.

Well Construction
(Click to Collapse...)
 
Construction
Start Date: 04/23/2015
Completed Date: 05/23/2015
Drill Method: Rotary Air
Depth of Completed Well: 470.00
Est. Depth Drilled: 470.00
Special Standards:
Seal Placed Method:
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement: ft to ft
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack:
Filter Pack Material:
Filter Pack Size:
Bore Hole
RowDiameter (in)From (ft)To (ft)
118.000.0020.00
214.0020.00205.00
312.00205.00241.00
412.00241.00470.00
Seal
RowMaterialFrom (ft)To (ft)AmountAmount Calc.
2Bentonite Chips0.0020.0038.0018.60
Abandonment Log
No data matches search criteria.
Casing/Liner
RowCasing/LinerDiameter (in)Above Land SurfaceFrom DepthTo (ft)GaugeMaterialWeldGlueThreadShoe
Inside
Shoe
Outside
Shoe
Other
Shoe
Location
1(Casing)Pre-Alteration14.00 ● 1.00 205.00 .250 Steel ●  
2(Casing)Pre-Alteration12.00 194.00 241.00 .250 Steel ●  
3Casing14.00 ● 1.00 205.00 .250 Steel ●  
4Liner12.00 194.00 241.00 .250 Steel ●  
Temporary Casing
No data matches search criteria.
Perforations
Screens
No data matches search criteria.
Well Test
(Click to Expand...)
 
Well Test
Temperature: 60 F
Lab Analysis:
Lab Analysis Done By:
Total Dissolved Solids:
Water Quality Concerns:
Well Test
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
 
Static Water Level
Depth First Water: 20.00
Pre-Static Water Level: 20.00
Pre-Static Water Level Date: 04/23/2015
Post-Static Water Level: 20.00
Post-Static Water Level Date: 05/23/2015
Static Water Level
RowDateFrom(ft)To(ft)SWLEst. Flow RatePSI
15/23/201520.00470.0020.00450.0 
Lithology
(Click to Expand...)
 
Material
RowFromToMaterialStatic Water Level
10.00241.00EXISTING 
2241.00355.00CLAYSTONE - GRAY 
3355.00368.00SANDSTONE - BLACK 
4368.00380.00CLAYSTONE - GREEN 
5380.00400.00CLAYSTONE - GRAY 
6400.00425.00SANDSTONE - GRAY 
7425.00450.00CLAY - GREEN 
8450.00470.00SANDSTONE - BLACK W/GREEN CLAYSTONE 
Well Constructor
(Click to Expand...)
 
Bonded Driller Name: TIMOTHY K RILEY
Bonded Driller Company: WESTERN DRILLING CO
Bonded Driller Number: 1424
Bonded Date Signed: 06/10/2015
Unbonded Name:
Unbonded Company:
Unbonded Number:
Unbonded Date Signed:
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
No data matches search criteria.
Documents
(Click to Expand...)
 
TitleDocument TypeSourceDownload ImageReceived Date
HARN 52202WELL REPORTDRILLERImage6/10/2015