Oregon Water Resources Department
Well Log Information System
Well Log:
DESC 61926
Main
Help
Return
Contact Us
Well Information
(Click to Collapse...)
Identification
Type of Report:
Water Well
Type of Work:
NEW
Well Report:
DESC
61926
View Log
Groundwater Site
Well Label:
48750
Start Card:
1045085
Original Report:
Owner Well Nbr:
Company Job Nbr:
Primary Use:
THERMAL , OTHER - TEST WELL
Complete Date:
03/14/2020
Land Owner
Name:
JARROD PENTTILA
Company:
OREGON STATE UNIVERSITY
Address:
1500 SW CHANDLER AVE.
BEND, OR 97702
Location
(Click to Collapse...)
Latitude/Longitude
Latitude:
44.04403200
Longitude:
-121.33428200
Horiz. Error:
ft.
Location
County:
DESC
TRSQQ:
WM18.00S12.00E6NESW
Tax Map:
181206C
Tax Lot:
100
Lot:
Block:
Subdivision:
Street of Well:
1500 SW CHANDLER AVE., BEND OR 97702
WM District:
11
Surface Elev:
Well Report Mapping Tool
Tax Lots
Note: Tax lot overlay available only for a few counties.
Well Construction
(Click to Collapse...)
Construction
Start Date:
10/28/2019
Completed Date:
03/14/2020
Drill Method:
Rotary Air
Depth of Completed Well:
512.00
Est. Depth Drilled:
512.00
Special Standards:
Seal Placed Method:
OTHER - PORED IN PLACE
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement:
ft to ft
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack:
Filter Pack Material:
Filter Pack Size:
Bore Hole
Row
Diameter (in)
From (ft)
To (ft)
1
16.00
0.00
70.00
2
12.00
70.00
512.00
Seal
Row
Material
From (ft)
To (ft)
Amount
Amount Calc.
1
Bentonite Chips
0.00
70.00
92.00
Abandonment Log
No data matches search criteria.
Casing/Liner
Row
Casing/Liner
Diameter (in)
Above Land Surface
From Depth
To (ft)
Gauge
Material
Weld
Glue
Thread
Shoe
Inside
Shoe
Outside
Shoe
Other
Shoe
Location
1
Casing
10.00
●
3.00
412.00
.250
Steel
●
Temporary Casing
No data matches search criteria.
Perforations
No data matches search criteria.
Screens
Row
Type
Material
Casing/Liner
Diameter (in)
Gauge
From (ft)
To (ft)
Screen Size
Slot Size
Nbr of Slots
Telescope/
Pipe size
1
JOHNSON
STAINLESS STEEL
Casing
12.00
412.00
512.00
0.100
0.10
Well Test
(Click to Expand...)
Well Test
Temperature:
50 F
Lab Analysis:
Lab Analysis Done By:
Water Systems Engineering
Total Dissolved Solids:
76.00 mg/L
Water Quality Concerns:
Well Test
Test Type
Yield (gpm)
Drawdown
Drill Stem/
Pump Depth
Duration (hr)
Calculated Specific Capacity (gpm/ft)
Pump
1200.0
13.3
410
2.0
90.23
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
Static Water Level
Depth First Water:
Pre-Static Water Level:
Pre-Static Water Level Date:
Post-Static Water Level:
248.50
Post-Static Water Level Date:
11/22/2019
Static Water Level
Row
Date
From(ft)
To(ft)
SWL
Est. Flow Rate
PSI
1
11/12/2019
250.00
512.00
248.45
1200.0
Lithology
(Click to Expand...)
Material
Row
From
To
Material
Static Water Level
1
0.00
10.00
BROWN SAND
2
10.00
20.00
PUMICE
3
20.00
50.00
TUFF
4
50.00
90.00
SCORIA WITH BASALT
5
90.00
100.00
BLACK SAND
6
100.00
110.00
BASALT
7
110.00
220.00
SCORIA WITH BASALT
8
220.00
230.00
BASALT
9
230.00
250.00
BASALT & SCORIA
10
250.00
260.00
SANDY BASALT
11
260.00
270.00
BASALT & SCORIA
12
270.00
340.00
BASALT
13
340.00
380.00
BASALT & SCORIA
14
380.00
400.00
BASALT
15
400.00
415.00
SCORIA
16
415.00
495.00
BASALT
17
495.00
512.00
BASALT & SCORIA
Well Constructor
(Click to Expand...)
Bonded Driller Name:
CHRIS HUMPHRIES
Bonded Driller Company:
JENSEN DRILLING CO
Bonded Driller Number:
1796
Bonded Date Signed:
03/23/2020
Unbonded Name:
Unbonded Company:
Unbonded Number:
Unbonded Date Signed:
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
Comments
(Click to Expand...)
Comments
Well was drilled as a test Well and following the pump test a decision to upgrade it and keep the well. It was determined that stainless steel rise was required rather than the carbon steel 12 inch that the well was drilled with so there was quite a lag in work following the pump test to completion of the well. the well was close to being complete with 12 inch steel and 12 inch telescoping screen they informed us that the well had to be comprised of all stainless steel – so we installed 10 inch
Documents
(Click to Expand...)
Title
Document Type
Source
Download Image
DESC 61926
EXEMPT USE MAP
DRILLER
Image
DESC 61926
WELL REPORT
DRILLER
Image