Well Information
(Click to Collapse...)
 
Identification
Type of Report: Water Well
Type of Work: NEW
Well Report: MARI 69844 View Log Groundwater Site
Well Label: 138849
Start Card: 1050454
Original Report: MARI 70668 View Original Log
Owner Well Nbr: PARR RD WELL
Company Job Nbr:
Primary Use: COMMUNITY
Complete Date: 05/07/2021
Land Owner
Name:
Company: CITY OF WOODBURN
Address: 190 GARFIELD ST

WOODBURN, OR 97071
Location
(Click to Collapse...)
 
Latitude/Longitude
Latitude:
Longitude:
Horiz. Error: ft.
Location
County: MARI
TRSQQ: WM5.00S2.00W13SWSE
Tax Map:
Tax Lot: 700
Lot:
Block:
Subdivision:
Street of Well: 900 PARR RD; WELL IS LOCATED IN SE CORNER OF CENTENNIAL PARK
WM District: 16
Surface Elev:
Well Report Mapping Tool
Tax Lots

Note: Tax lot overlay available only for a few counties.

Well Construction
(Click to Collapse...)
 
Construction
Start Date: 02/18/2021
Completed Date: 05/07/2021
Drill Method: OTHER - DUAL ROTARY REVERSE
Depth of Completed Well: 310.00
Est. Depth Drilled: 319.00
Special Standards:
Seal Placed Method:
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement: ft to ft
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack: 224.00 ft to 310.00 ft
Filter Pack Material: GRAVEL
Filter Pack Size: 1/4 x 1/8
Bore Hole
Seal
No data matches search criteria.
Abandonment Log
No data matches search criteria.
Casing/Liner
RowCasing/LinerDiameter (in)Above Land SurfaceFrom DepthTo (ft)GaugeMaterialWeldGlueThreadShoe
Inside
Shoe
Outside
Shoe
Other
Shoe
Location
1Casing16.00 3.00 275.00 .375 Steel 319.00
2Casing16.00 305.00 310.00 .375 Steel 319.00
Temporary Casing
No data matches search criteria.
Perforations
No data matches search criteria.
Screens
Well Test
(Click to Expand...)
 
Well Test
Temperature: 63 F
Lab Analysis:
Lab Analysis Done By:
Total Dissolved Solids: 90.00 mg/L
Water Quality Concerns:
Well Test
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
 
Static Water Level
Depth First Water: 70.00
Pre-Static Water Level:
Pre-Static Water Level Date:
Post-Static Water Level: 44.30
Post-Static Water Level Date: 04/19/2021
Static Water Level
RowDateFrom(ft)To(ft)SWLEst. Flow RatePSI
14/19/2021180.00315.0044.301500.0 
Lithology
(Click to Expand...)
 
Material
RowFromToMaterialStatic Water Level
10.0020.00SANDY SILT WITH GRAVEL, WET, BROWN 
220.0070.00SANDY CLAY, MEDIUM PLASTICITY, GRAY OLIVE 
370.0090.00FINE-MEDIUM SAND WITH SILT, BLACK 
490.00100.00SANDY CLAY, MEDIUM PLASTICITY, GRAY OLIVE 
5100.00170.00GRAVEL WITH MEDIUM-COARSE SAND, OLIVE GRAY 
6170.00180.00CLAY, MEDIUM PLASTICITY, WET, GRAY OLIVE 
7180.00230.00FINE-COARSE SAND WITH CLAY, GRAY OLIVE 
8230.00255.00WELL GRADED GRAVEL WITH MEDIUM-COARSE SAND 
9255.00270.00SANDY/GRAVELLY CLAY, HIGH PLASTICITY, GRAY 
10270.00305.00WELL GRADED GRAVEL WITH MEDIUM-COARSE SAND 
11305.00315.00FINE-MEDIUM SAND WITH SILT, BROWN 
12315.00319.00SANDY CLAY, HIGH PLASTICITY, BROWN 
Well Constructor
(Click to Expand...)
 
Bonded Driller Name: ROBERT STADELI
Bonded Driller Company: HOLT SERVICES INC
Bonded Driller Number: 1523
Bonded Date Signed: 05/13/2021
Unbonded Name: SANDY,DAVID
Unbonded Company: HOLT SERVICES INC
Unbonded Number: 2040
Unbonded Date Signed: 05/13/2021
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
No data matches search criteria.
Documents
(Click to Expand...)
 
TitleDocument TypeSourceDownload Image
MARI 69844EXEMPT USE MAPDRILLERImage
MARI 69844WELL REPORTDRILLERImage