Oregon Water Resources Department
Well Log Information System
Well Log:
DESC 3032
Main
Help
Return
Contact Us
Well Information
(Click to Collapse...)
Identification
Type of Report:
Water Well
Type of Work:
NEW
Well Report:
DESC
3032
View Log
Groundwater Site
Well Label:
Start Card:
Original Report:
Owner Well Nbr:
Company Job Nbr:
Primary Use:
IRRIGATION
Complete Date:
08/01/1963
Land Owner
Name:
LLOYD F BROGAN
Company:
Address:
PO BOX 1331
SANTA ANA, CA
Location
(Click to Collapse...)
Latitude/Longitude
Latitude:
44.28036790
Longitude:
-121.52325686
Horiz. Error:
1000.00
ft.
Location
County:
DESC
TRSQQ:
WM15.00S10.00E10SE
Tax Map:
Tax Lot:
Lot:
Block:
Subdivision:
Street of Well:
WM District:
11
Surface Elev:
3173.47
FT
Well Report Mapping Tool
Tax Lots
Note: Tax lot overlay available only for a few counties.
Well Construction
(Click to Collapse...)
Construction
Start Date:
05/18/1963
Completed Date:
08/01/1963
Drill Method:
Cable
Depth of Completed Well:
120.00
Est. Depth Drilled:
120.00
Special Standards:
Seal Placed Method:
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement:
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack:
Filter Pack Material:
Filter Pack Size:
Bore Hole
Row
Diameter (in)
From (ft)
To (ft)
1
12.00
0.00
120.00
Seal
No data matches search criteria.
Abandonment Log
No data matches search criteria.
Casing/Liner
Row
Casing/Liner
Diameter (in)
Above Land Surface
From Depth
To (ft)
Gauge
Material
Weld
Glue
Thread
Shoe
Inside
Shoe
Outside
Shoe
Other
Shoe
Location
1
Casing
12.00
0.00
33.00
.250
●
Temporary Casing
No data matches search criteria.
Perforations
Row
Method
Material
Casing/Liner
Diameter (in)
From (ft)
To (ft)
Perforation
Size
Screen/Slot
Size Width
Slot Length
Nbr of Slots
1
CUTTING TORCH
20.00
33.00
3.00
0.250
21
Screens
No data matches search criteria.
Well Test
(Click to Expand...)
Well Test
Temperature:
Lab Analysis:
Lab Analysis Done By:
Total Dissolved Solids:
Water Quality Concerns:
Well Test
Test Type
Yield (gpm)
Drawdown
Drill Stem/
Pump Depth
Duration (hr)
Calculated Specific Capacity (gpm/ft)
Pump
50.0
95.0
2.0
0.53
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
Static Water Level
Depth First Water:
Pre-Static Water Level:
Pre-Static Water Level Date:
Post-Static Water Level:
8.00
Post-Static Water Level Date:
07/12/1963
Static Water Level
No data matches search criteria.
Lithology
(Click to Expand...)
Material
Row
From
To
Material
Static Water Level
1
0.00
4.00
OVER BURDEN
2
4.00
33.00
LARGE BOULDERS COARSE GRAVEL
3
33.00
67.00
ROCK GREY
4
67.00
89.00
CLAY LIGHT TAN
5
89.00
112.00
PUMICE SAND BLACK
6
112.00
120.00
FINE SAND
Well Constructor
(Click to Expand...)
Bonded Driller Name:
CECIL TACKITT
Bonded Driller Company:
HURST WELL DRILLING CO
Bonded Driller Number:
318
Bonded Date Signed:
09/07/1963
Unbonded Name:
Unbonded Company:
Unbonded Number:
Unbonded Date Signed:
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
No data matches search criteria.
Documents
(Click to Expand...)
Title
Document Type
Source
Download Image
DESC 3032
WELL REPORT
DRILLER
Image