Oregon Water Resources Department
Well Log Information System
Well Log:
MORR 52735
Main
Help
Return
Contact Us
Well Information
(Click to Collapse...)
Identification
Type of Report:
Water Well
Type of Work:
DEEPENING
Well Report:
MORR
52735
View Log
Groundwater Site
Well Label:
134388
Start Card:
1056329
Original Report:
MORR
52683
View Original Log
Owner Well Nbr:
AIRPORT WELL 3
Company Job Nbr:
Primary Use:
INDUSTRIAL
Complete Date:
09/13/2022
Land Owner
Name:
Company:
PORT OF MORROW
Address:
2 MARINE DR
BOARDMAN, OR 97818
Location
(Click to Collapse...)
Latitude/Longitude
Latitude:
45.81532500
Longitude:
-119.81208200
Horiz. Error:
99.00
ft.
Location
County:
MORR
TRSQQ:
WM4.00N24.00E21SENE
Tax Map:
Tax Lot:
131
Lot:
Block:
Subdivision:
Street of Well:
AT THE JUNCTION OF BOARDMAN AIRPORT LANE AND BOARDMAN AIRPORT
WM District:
5
Surface Elev:
371.39
FT
Well Report Mapping Tool
Tax Lots
Note: Tax lot overlay available only for a few counties.
Well Construction
(Click to Collapse...)
Construction
Start Date:
04/23/2022
Completed Date:
09/13/2022
Drill Method:
Rotary Air
Depth of Completed Well:
1570.00
Est. Depth Drilled:
1632.00
Special Standards:
Seal Placed Method:
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement:
1230.00 ft to 1302.00 ft
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack:
Filter Pack Material:
Filter Pack Size:
Bore Hole
Row
Diameter (in)
From (ft)
To (ft)
1
9.88
1302.00
1570.00
Seal
No data matches search criteria.
Abandonment Log
No data matches search criteria.
Casing/Liner
Row
Casing/Liner
Diameter (in)
Above Land Surface
From Depth
To (ft)
Gauge
Material
Weld
Glue
Thread
Shoe
Inside
Shoe
Outside
Shoe
Other
Shoe
Location
1
Casing
10.00
1219.00
1302.00
.365
Steel
●
●
●
1302.00
Temporary Casing
Temp Casing
Diameter (in)
From (ft)
To (ft)
●
10.00
2.00
1219.00
Perforations
No data matches search criteria.
Screens
No data matches search criteria.
Well Test
(Click to Expand...)
Well Test
Temperature:
75 F
Lab Analysis:
Lab Analysis Done By:
GSI Water Solutions
Total Dissolved Solids:
540.00 mg/L
Water Quality Concerns:
Well Test
Test Type
Yield (gpm)
Drawdown
Drill Stem/
Pump Depth
Duration (hr)
Calculated Specific Capacity (gpm/ft)
Pump
100.0
478.9
5.0
0.21
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
Static Water Level
Depth First Water:
1321.00
Pre-Static Water Level:
80.00
Pre-Static Water Level Date:
01/05/2022
Post-Static Water Level:
81.90
Post-Static Water Level Date:
11/22/2022
Static Water Level
Row
Date
From(ft)
To(ft)
SWL
Est. Flow Rate
PSI
1
6/20/2022
1321.00
1324.00
77.61
50.0
2
6/20/2022
1460.00
1475.00
77.61
50.0
Lithology
(Click to Expand...)
Material
Row
From
To
Material
Static Water Level
1
1302.00
1321.00
BASALT HARD BLACK
2
1321.00
1324.00
FRACTURED BASALT WB
3
1324.00
1342.00
BASALT BLACK HARD
4
1342.00
1350.00
BASALT DARK GRAY FRACTURED
5
1350.00
1362.00
BASALT HARD BLACK
6
1362.00
1420.00
BASALT HARD BLACK
7
1420.00
1427.00
BASALT BLACK FRACTURED
8
1427.00
1460.00
BASALT HARD BLACK
9
1460.00
1465.00
BASALT FRACTURED WB
10
1475.00
1482.00
BASALT HARD BLACK
11
1482.00
1503.00
BLACK FRACTURED WITH BROWN AND RED OXIDATION
12
1543.00
1550.00
BASALT HARD BLACK
13
1560.00
1567.00
BASALT MEDIUM BLACK
14
1567.00
1617.00
MEDIUM SOFT WEATHERED BASALT BLUEISH GREEN
15
1617.00
1632.00
BASALT BLACK MEDIUM/HARD
Well Constructor
(Click to Expand...)
Bonded Driller Name:
ROBERT STADELI
Bonded Driller Company:
HOLT SERVICES INC
Bonded Driller Number:
1523
Bonded Date Signed:
10/31/2022
Unbonded Name:
SANDY,DAVID
Unbonded Company:
HOLT SERVICES INC
Unbonded Number:
2040
Unbonded Date Signed:
10/31/2022
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
Comments
(Click to Expand...)
Comments
10" casing was installed from 1302 to ground surface initially prior to deepening. Upon completion it was then cut off and removed from 1219 feet BGS leaving 83 feet of casing. Cement was placed around the 10" casing and previous 14-3/4" hole from 1230' to 1302' prior to drilling to isolate new construction from previous construction. Final construction has both zones combined. Pump test shown was performed in the isolated 10" borehole only
Borehole backfilled with cement from 1632 to 1570, 26 sacks of cement.
Documents
(Click to Expand...)
Title
Document Type
Source
Download Image
ARCHIVE DOCUMENT
OTHER
ARCHIVE
Image
MORR 52735
WELL REPORT
DRILLER
Image