Oregon Water Resources Department
Well Log Information System
Well Log:
DESC 6503
Main
Help
Return
Contact Us
Well Information
(Click to Collapse...)
Identification
Type of Report:
Water Well
Type of Work:
NEW
Well Report:
DESC
6503
View Log
Groundwater Site
Well Label:
Start Card:
Original Report:
Owner Well Nbr:
Company Job Nbr:
Primary Use:
COMMUNITY
Complete Date:
03/28/1972
Land Owner
Name:
PATRICK GISLER
Company:
Address:
PO BOX 7
BEND, OR 97709
Location
(Click to Collapse...)
Latitude/Longitude
Latitude:
43.74184765
Longitude:
-121.60897788
Horiz. Error:
100.00
ft.
Location
County:
DESC
TRSQQ:
WM21.00S9.00E23
Tax Map:
Tax Lot:
Lot:
Block:
Subdivision:
Street of Well:
WM District:
11
Surface Elev:
Well Report Mapping Tool
Tax Lots
Note: Tax lot overlay available only for a few counties.
Well Construction
(Click to Collapse...)
Construction
Start Date:
03/13/1972
Completed Date:
03/28/1972
Drill Method:
Cable
Depth of Completed Well:
108.00
Est. Depth Drilled:
108.00
Special Standards:
Seal Placed Method:
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement:
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack:
Filter Pack Material:
Filter Pack Size:
Bore Hole
Row
Diameter (in)
From (ft)
To (ft)
1
16.00
0.00
27.00
2
10.00
27.00
108.00
Seal
No data matches search criteria.
Abandonment Log
No data matches search criteria.
Casing/Liner
Row
Casing/Liner
Diameter (in)
Above Land Surface
From Depth
To (ft)
Gauge
Material
Weld
Glue
Thread
Shoe
Inside
Shoe
Outside
Shoe
Other
Shoe
Location
1
Casing
6.00
0.00
85.00
.250
●
Temporary Casing
No data matches search criteria.
Perforations
Row
Method
Material
Casing/Liner
Diameter (in)
From (ft)
To (ft)
Perforation
Size
Screen/Slot
Size Width
Slot Length
Nbr of Slots
1
TORCH
67.00
83.00
0.250
6.000
90
Screens
No data matches search criteria.
Well Test
(Click to Expand...)
Well Test
Temperature:
44 F
Lab Analysis:
Lab Analysis Done By:
Total Dissolved Solids:
Water Quality Concerns:
Well Test
Test Type
Yield (gpm)
Drawdown
Drill Stem/
Pump Depth
Duration (hr)
Calculated Specific Capacity (gpm/ft)
Pump
115.0
13.0
24.0
8.85
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
Static Water Level
Depth First Water:
80.00
Pre-Static Water Level:
Pre-Static Water Level Date:
Post-Static Water Level:
73.00
Post-Static Water Level Date:
03/28/1972
Static Water Level
No data matches search criteria.
Lithology
(Click to Expand...)
Material
Row
From
To
Material
Static Water Level
1
0.00
19.00
PUMAS
2
19.00
27.00
GRAY CLAY AND GRAVEL
3
27.00
32.00
BLACK LAVA
4
32.00
47.00
RED LAVA
5
47.00
51.00
BROKEN ROCK AND CINDERS
6
51.00
61.00
BLACK LAVA
7
61.00
72.00
RED CINDERS
8
72.00
80.00
RED LAVA
9
80.00
85.00
CINDERS AND GRAVEL
73.00
10
85.00
106.00
BLACK LAVA
73.00
11
106.00
108.00
GRAY LAVA
73.00
Well Constructor
(Click to Expand...)
Bonded Driller Name:
JOHN CUNNINGHAM
Bonded Driller Company:
Bonded Driller Number:
539
Bonded Date Signed:
03/29/1972
Unbonded Name:
Unbonded Company:
Unbonded Number:
Unbonded Date Signed:
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
No data matches search criteria.
Documents
(Click to Expand...)
Title
Document Type
Source
Download Image
DESC 6503
WELL REPORT
DRILLER
Image