Oregon Water Resources Department
Well Log Information System
Well Log:
GILL 1
Main
Help
Return
Contact Us
Well Information
(Click to Collapse...)
Identification
Type of Report:
Water Well
Type of Work:
NEW
Well Report:
GILL
1
View Log
Groundwater Site
Well Label:
Start Card:
Original Report:
Owner Well Nbr:
Company Job Nbr:
Primary Use:
IRRIGATION
Complete Date:
05/13/1974
Land Owner
Name:
RAY HEIMBIGNER
Company:
Address:
IONE, OR 97843
Location
(Click to Collapse...)
Latitude/Longitude
Latitude:
45.50552000
Longitude:
-120.04967000
Horiz. Error:
11.00
ft.
Location
County:
GILL
TRSQQ:
WM1.00S22.00E3SWSE
Tax Map:
Tax Lot:
Lot:
Block:
Subdivision:
Street of Well:
WM District:
21
Surface Elev:
Well Report Mapping Tool
Tax Lots
Note: Tax lot overlay available only for a few counties.
Well Construction
(Click to Collapse...)
Construction
Start Date:
08/20/1971
Completed Date:
05/13/1974
Drill Method:
Cable
Depth of Completed Well:
1035.00
Est. Depth Drilled:
1035.00
Special Standards:
Seal Placed Method:
Abandonment Start Date:
Abandonment Completed Date:
Backfill
Backfill Placement:
Backfill Material:
Explosives Used:
Explosive Type:
Explosive Amount:
Filter Pack
Filter Pack:
Filter Pack Material:
Filter Pack Size:
Bore Hole
Row
Diameter (in)
From (ft)
To (ft)
1
21.00
0.00
21.00
2
16.00
21.00
185.00
3
15.25
185.00
1035.00
Seal
No data matches search criteria.
Abandonment Log
No data matches search criteria.
Casing/Liner
Row
Casing/Liner
Diameter (in)
Above Land Surface
From Depth
To (ft)
Gauge
Material
Weld
Glue
Thread
Shoe
Inside
Shoe
Outside
Shoe
Other
Shoe
Location
1
Casing
16.00
0.00
185.00
0.250 - Gauge
Steel
●
Temporary Casing
No data matches search criteria.
Perforations
No data matches search criteria.
Screens
Row
Type
Material
Casing/Liner
Diameter (in)
Gauge
From (ft)
To (ft)
Screen Size
Slot Size
Nbr of Slots
Telescope/
Pipe size
1
IRRIGATOR
STEEL
Liner
16.00
185.00
190.00
.1
Well Test
(Click to Expand...)
Well Test
Temperature:
63 F
Lab Analysis:
Lab Analysis Done By:
Total Dissolved Solids:
Water Quality Concerns:
Well Test
Test Type
Yield (gpm)
Drawdown
Drill Stem/
Pump Depth
Duration (hr)
Calculated Specific Capacity (gpm/ft)
Pump
1700.0
84.0
6.0
20.24
Analysis
No data matches search criteria.
Static Water Level
(Click to Expand...)
Static Water Level
Depth First Water:
178.00
Pre-Static Water Level:
Pre-Static Water Level Date:
Post-Static Water Level:
72.00
Post-Static Water Level Date:
05/13/1974
Static Water Level
Row
Date
From(ft)
To(ft)
SWL
Est. Flow Rate
PSI
1
178.00
201.00
67.00
2
201.00
503.00
72.00
3
503.00
796.00
78.00
4
796.00
1035.00
72.00
Lithology
(Click to Expand...)
Material
Row
From
To
Material
Static Water Level
1
0.00
11.00
TOP SOIL AND FREE ROCK
2
11.00
122.00
BASALT GREY
3
122.00
178.00
BLACK STICKY CLAY
4
178.00
190.00
ROUND WASHED ROCK AND WATER
67.00
5
190.00
201.00
YELLOW CLAY AND ROCK
67.00
6
201.00
310.00
HARD GREY BASALT
72.00
7
310.00
503.00
BASALT WITH CREVES AND PORIS ROCK, SOME GREEN
8
503.00
638.00
RED AND YELLOW LAVA ROCK
78.00
9
638.00
796.00
HARD GREY BASALT
10
796.00
1035.00
HARD GREY BASALT WITH CREVICE
72.00
Well Constructor
(Click to Expand...)
Bonded Driller Name:
WILLIAM C WALTER
Bonded Driller Company:
Bonded Driller Number:
508
Bonded Date Signed:
06/01/1974
Unbonded Name:
Unbonded Company:
Unbonded Number:
Unbonded Date Signed:
Other Name:
Other Affiliation:
Other License Nbr:
Geologist Engineer:
Comments
(Click to Expand...)
Comments
The water level in this well decreased to 81 ft Aug 8 1973 and back up to 67 ft on Aug 9 1974. This change I believe was caused by surging of other wells and free flow. The water temperature rose from 58 degrees to 63 degrees at 796ft.
Documents
(Click to Expand...)
Title
Document Type
Source
Download Image
Received Date
GILL 1
WELL REPORT
DRILLER
Image
6/10/1974