Facility Water Use Report

BONANZA SCHOOL INJECTION WELL 3 (KLAM 58281/L-105421)
Report ID


PROPOSED WELL 3;
500 FEET SOUTH AND 620 FEET EAST FROM W1/4 CORNER, SECTION 10
(39S-11E-10-NW SW)


Records per page:
Acre-feet (AF) of Water Used
Water Year*Method of MeasurementOctNovDecJanFebMarAprMayJunJulAugSepTotal Water UsedIrrigated Acres
2023OTH0.000.000.000.000.000.000.000.000.000.000.000.000.00 
2013 78.9182.9893.9994.47115.760.000.0063.7067.3967.3970.0473.66808.30 
*The water year is named for the calendar year in which it ends. Example: the 2014 water year begins Oct. 1, 2013 and ends Sep. 30, 2014.

Method(s) of Measurement:
OTHreinjection well in place (2023)

  • Monthly amounts indicate:
    • For diverted rights, the total amount diverted during the month;
    • For storage rights, the amount generally stored in the reservoir/pond during the month, as represented by the volume of water impounded on approximately the same day each month.
  • Water Use amounts have all been converted to "acre-feet" (AF), regardless of the original measurement unit reported. One AF is the volume of water that will cover an acre of ground one foot deep = 325,850 gallons.
  • Zeroes indicate that a report was received, stating that no water was used during those months; if a year is not listed, no report of water use was received for that year.