|
|
| Status: Non-Cancelled |
| County: Baker |
| Basin: Powder |
| Authority: HB2376 |
| File Folder Location: Salem |
|
|
| POD 1 - UNNAMED STREAM/POND 1 > TIMBER CAN CREEK |
|
|
| | Description |
|
|
| | | T-R-S-QQ: 9.00S-46.00E-3-SW NW |
|
|
| | POD Rate |
|
|
| | | |
1/28/1997 | | 0.0 | 1.0 | 1.0 | | | | 1/1 | 12/31 | |
|
|
|
| | Reservoir |
|
|
| | | POND 1 |
|
|
| POD 2 - UNNAMED STREAM/POND 2 > TIMBER CAN CREEK |
|
|
| | Description |
|
|
| | | T-R-S-QQ: 9.00S-46.00E-15-NE NE |
|
|
| | POD Rate |
|
|
| | | |
1/28/1997 | | 0.0 | 1.0 | 0.0(est) | | | | 1/1 | 12/31 | |
|
|
|
| | Reservoir |
|
|
| | | POND 2 |
|
|
|
|
|
|