Contact Information
(Click to Collapse...)
 

Skip Navigation Links.
Collapse Contact informationContact information
OWNER:
ROBERT STRODA
96535-A TERRITORIAL RD
MONROE, OR 97456

Processing History
(Click to Collapse...)
 
Skip Navigation Links.
Expand Application: S 73758  Application: S 73758
Collapse Permit: S 51858  <a href='https://apps.wrd.state.or.us/apps/misc/vault/vault.aspx?Type=Permit&permit_char=S&permit_nbr=51858'>document</a> , <a href='https://apps.wrd.state.or.us/apps/misc/vault/vault.aspx?Type=PermitMap&permit_char=S&permit_nbr=51858'>paper map</a> Permit: S 51858 document , paper map
Signature: 1/30/1996
Process StepDate CompletedResultCompleted By
Final Proof1/30/1996  
CBU Received6/23/1998 PAULA LEE NORNESS
Proposed Certificate Mailing8/21/2009 JERRY GAINEY
Certificate Issued11/13/2009 JERRY GAINEY
View right with Web Mapping
View Places of Use from Water Rights in the Same Area
View Reported Water Use


Water Right Information
(Click to Collapse...)
 

Skip Navigation Links.
Status: Non-Cancelled
County: Benton, Lane
Basin: Willamette
File Folder Location: Salem
Contract: BOR 5-07-10-W1065
Watermaster District: 2

Scanned Documents
(Click to Expand...)
 


Records per page:

Skip Navigation Links.

Point(s) of Diversion
(Click to Collapse...)
 

Skip Navigation Links.
Expand <a href='water_right_research_query.aspx?snp_id=50274&pod_location_id=44505'> POD 1 - LONG TOM RIVER/RESERVOIR > WILLAMETTE RIVER</a> POD 1 - LONG TOM RIVER/RESERVOIR > WILLAMETTE RIVER
Expand <a href='water_right_research_query.aspx?snp_id=50274&pod_location_id=44506'> POD 2 - LONG TOM RIVER/RESERVOIR > WILLAMETTE RIVER</a> POD 2 - LONG TOM RIVER/RESERVOIR > WILLAMETTE RIVER
Expand <a href='water_right_research_query.aspx?snp_id=50274&pod_location_id=44507'> POD 3 - LONG TOM RIVER/RESERVOIR > WILLAMETTE RIVER</a> POD 3 - LONG TOM RIVER/RESERVOIR > WILLAMETTE RIVER

Place(s) of Use
(Click to Collapse...)
 
Add TRS grouping        
Skip Navigation Links.
Expand <table style='width: 400px; white-space: pre-wrap;'><tr><td>Use - IRRIGATION</td></tr></table> (Primary) - 165.1 acres; Priority Date: 11/8/1993
Use - IRRIGATION
(Primary) - 165.1 acres; Priority Date: 11/8/1993

Water Right Genealogy
(Click to Collapse...)