Contact Information
(Click to Collapse...)
 

Skip Navigation Links.
Collapse Contact informationContact information
OWNER:
ADELAIDE W HILP
HANNA W EPPINGER
MYRTLE CREEK, OR 97457

Processing History
(Click to Collapse...)
 
Skip Navigation Links.
Expand Application: S 16048  Application: S 16048
Expand Permit: S 11867  <a href='https://apps.wrd.state.or.us/apps/misc/vault/vault.aspx?Type=Permit&permit_char=S&permit_nbr=11867'>document</a> , <a href='https://apps.wrd.state.or.us/apps/misc/vault/vault.aspx?Type=PermitMap&permit_char=S&permit_nbr=11867'>paper map</a> Permit: S 11867 document , paper map
Collapse Certificate: 12251  <a href='https://apps.wrd.state.or.us/apps/misc/vault/vault.aspx?Type=Cert&cert_nbr=12251'>document</a> Certificate: 12251 document
Staff Person Responsible: no caseworker currently assigned
Signature: 10/18/1939
Type: Original
Collapse Order(s)Order(s)
Order OriginVolume-PageSignatureDescription
Special3-26311/18/1938ORDER EXTENDING TIME WITHIN WHICH TO COMPLETE CONSTRUCTION WORK AND APPLY THE WATER UNDER CERTAIN PERMITS ISSUED BY THE STATE ENGINEER.
Special3-39711/30/1939ORDER EXTENDING TIME LIMITS FOR COMPLETION OF CONSTRUCTION WORK AND COMPLETE APPLICATION OF WATER UNDER CERTAIN PERMITS ISSUED BY THE STATE ENGINEER.
Unable to view right in new web mapping because this water right is not currently mapped.
View Places of Use from Water Rights in the Same Area


Water Right Information
(Click to Collapse...)
 

Skip Navigation Links.
Status: Cancelled
County: Douglas
Basin: Umpqua
File Folder Location: Salem
Watermaster District: 15

Scanned Documents
(Click to Expand...)
 


Records per page:
Document TypeDocument TitleDateRemarks
PermitPermit S11867 Map Image10/31/1935 
PermitPermit S11867 Image10/31/1935 
OrderOrder Image - Volume: 3 Page: 26311/18/1938ORDER EXTENDING TIME WITHIN WHICH TO COMPLETE CONSTRUCTION WORK AND APPLY THE WATER UNDER CERTAIN PERMITS ISSUED BY THE STATE ENGINEER.
CertificateCertificate 12251 Image10/18/1939 
OrderOrder Image - Volume: 3 Page: 39711/30/1939ORDER EXTENDING TIME LIMITS FOR COMPLETION OF CONSTRUCTION WORK AND COMPLETE APPLICATION OF WATER UNDER CERTAIN PERMITS ISSUED BY THE STATE ENGINEER.

Skip Navigation Links.

Point(s) of Diversion
(Click to Collapse...)
 

Skip Navigation Links.
Expand POD 1 - SOUTH UMPQUA RIVER > ; CNPOD 1 - SOUTH UMPQUA RIVER > ; CN
Expand POD 2 - SOUTH UMPQUA RIVER > ; CNPOD 2 - SOUTH UMPQUA RIVER > ; CN

Place(s) of Use
(Click to Collapse...)
 
Add TRS grouping        
Skip Navigation Links.
Expand <table style='width: 400px; white-space: pre-wrap;'><tr><td>Use - IRRIGATION</td></tr></table> (Primary) - 9.7 acres; Priority Date: 9/18/1935
Use - IRRIGATION
(Primary) - 9.7 acres; Priority Date: 9/18/1935
Expand <table style='width: 400px; white-space: pre-wrap;'><tr><td>Use - SUPPLEMENTAL IRRIGATION</td></tr></table> (Supplemental) - 15.0 acres; Priority Date: 9/18/1935
Use - SUPPLEMENTAL IRRIGATION
(Supplemental) - 15.0 acres; Priority Date: 9/18/1935

Water Right Genealogy